Project Obstacles
  • Re-used an existing structure already erected on the site and tied it into the new construction.
  • Permit issuances with the Public Improvements.
  • Compressed construction schedule.
Project Completion Date
Project Duration

9 Months

Project Overview: Papé Medford, OR - JB STEEL®

Client's Requirement

The client, Papé, required a distinctive and large facility to effectively separate material handling operations from agricultural functions. This division was vital to streamline their processes and enhance operational efficiency.

Our Innovative Solution

Leveraging our expertise from prior expansions of Papé's existing buildings, JB STEEL® crafted a sophisticated program. This program enabled the segregation of various operations, allowing them to function independently yet cohesively. Our approach involved keeping all planning and development in-house, which ensured a streamlined and cohesive process from start to finish.

Comprehensive Services Rendered

For this project, our team at JB STEEL® provided an array of services, including:

  • Design-Build
  • Construction Management & General Contracting
  • Civil Construction
  • Structural Concrete
  • Structural Steel Fabrication & Installation

These services were integral in transforming the project from a vision into a tangible, functional facility.

Challenges and Triumphs

Several significant challenges were skillfully navigated during this project:

  1. Integration of Existing Structures: We successfully incorporated an already erected structure on the site into the new construction, showcasing our ability to blend old with new effectively.

  2. Navigating Permitting Processes: We adeptly handled permit issuances related to Public Improvements, ensuring compliance and smooth progression.

  3. Time Constraints: Despite a compressed construction schedule, our team managed to maintain quality and efficiency, completing the project within the stipulated timeline.

Project Timeline and Completion

The entire project was executed within a 9-month period, culminating in its completion in September 2023.

Client and Project Type

The project was commissioned for Papé, known for its extensive operations. The project encompassed a Pre-engineered Metal Building, crafted through a Design-Build approach, featuring concrete tilt-up construction methods.

Metallic Builder of the Year Award

The Builder of the Year Award is presented annually to an Authorized Metallic Builder to recognize their consistent contributions to the pre-engineered metal building construction industry and their local community, and the builder’s innovative use of metal building materials. JB STEEL® has previously earned Metallic excellence and merit awards and a spot in the Metallic M-Team (top 25 builders in the nation) on numerous occasions.

View our Awards
American Concrete Institute

JB STEEL® is a proud member of the American Concrete Institute.

Associated General Contractors

JB STEEL® is a proud member of Associated General Contractors of America in the Columbia chapter. We have been a member since 1970.